Back
THORN Gold-Silver ASSET
ASSET DESCRIPTION
ASSET DESCRIPTION
Overview
Contained Material
Operations
Fleet
Energy
Economics
Access to Property
ASSET NAME
THORN Gold-Silver
ASSET TYPE
Exploration
Exploration METALS & MINERALS
Gold, Silver
DEPOSIT TYPE
Epithermal HS vein, Diatreme Breccia, Sediment hosted, porphyry
TOTAL WORKFORCE (CONTRACTORS INCLUDED)
20
ESTIMATED NO. LOCALLY EMPLOYED
12
SPECIFIC LOCATION
Sutlahine R, Stikine Region, BC, Canada
CURRENT ASSET STATUS
  • Drilling
  • Scoping
  • Seeking Partnership
THE LARGEST
Abundant high grade gold-silver intercepts and showings
ONE OF THE TOP
One of the top silver intercepts on record, 95m of 628 g/t Ag, plus gold-Zn, Pb, Cu for 900 g/t AgEq
REFERENCE OR DISTRICT NAME
NorthWest BC Trend
NAME OF TREND
THORN gold-silver distrct
NAME OF BELT
Scotch Belt
HISTORICAL OWNERSHIP
OWNERSHIPFROMTOCOMMENT
THORN Gold-Silver was acquired onJan 1, 2007
Including work by Brixton a total 323 silts, 5,194 soils, 1,321 rocks samples were collected. Geophysical work included ground magnetics, IP, airborne VTEM, and magnetics. The total drilling to date is 21,327m within 155 holes property wide.
Kennco Explorations (Western) LimitedJan 1, 1959Jan 1, 2007
MINERAL RESOURCES AND RESERVES
Mineral Resources:
MetalMeasuredIndicatedInferredAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffTonnageGradeContainedContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 8.4 k mt 90 g/t 21.5 m oz 100
Mineral Reserves:
MetalProvenProbableAttributable interests
TonnageGradeContainedCutOffTonnageGradeContainedCutOffContained
Gold 0 k mt 0 g/t 0 k oz 0 g/t 0 k mt 0 g/t 0 k oz 0 g/t 0
Silver 0 k mt 0 g/t 0 m oz 0 g/t 0 k mt 0 g/t 0 m oz 0 g/t 0
DISCOVERY COST
Reserve: Gold (oz)
$ 0.00
TOTAL CASH COST PER GOLD OUNCE
Amount in millionsMiningProcessingAdminRoyaltiesTotal%
Fuel000000 %
Maintenance000000 %
Labour000000 %
Insurance000000 %
Royalities000000 %
Reagents000000 %
Explosives000000 %
Contractors/consultants000000 %
Other*000000 %
Total US$ millions000000 %
PRODUCTION
PRODUCTION CYCLE Annual 2026 Experiences Expectations
2025 Q1 Q2 Q3 Q4 2026 5 Year Avg Remaining LOM
00000000Capital Expenditures13
00000000Ore Tons Mined23
00000000Mill Feed - Ore Tons Processed33
00000000Gold (k oz) Produced792
00000000Silver (m oz) Produced932
00000000Gold (k oz) Sold791
00000000Silver (m oz) Sold931
00000000Gold Recovery (%)794
00000000Silver Recovery (%)934
00000000Cash Operating Cost43
00000000All - in Sustaining Costs53
00000000Strip Ratio – Waste:Ore63
ARTICULATED HAULERS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
MINING TRUCKS
US METRIC
TRUCKSNo. OF TRUCKSNET POWER (HP)LOAD CAPACITY (tons)
POWER DEMAND
ENERGY SOURCEENERGY TYPEAVAILABLE POWER (MW)US$ PER KWHCONTRACT #EXPIRATION DATE
POWER AND ENGINEERING
Power Usage: total MWh per year
Peak power demand MW
Environmental Impact Assessment, man hours
Engineering firms
Local firms
AFTER TAX & ROYALTY NET PRESENT VALUE
Initial Capital Cost Operating Expenses NVP Discount RatePayback periodAfter tax IRRGold (oz)Silver (oz)
Date of Assessment
Jun 13, 2026
ACCESS TO PROPERTY
ROAD ACCESS
  • No road
AIRPORT ACCESS
  • Private airstrip
  • Airport - charter access
AIRPORT NAME
ESTIMATED TRAVEL TIME
1 hour
SITE VISIT AVAILABILITY

Travel Description

a commercial flight to Whitehorse Yukon, then a one hour flight via fixed wing charter to the Thorn property

FreeText